The process

From a few photos to a finished room.

No mystery, no disappearing crew. Here is what happens and when.

Before anything1. Send photos

Use the quote form. Two or four photos of the wall and yard where the room would go, plus the rough size you are thinking. You hear back within one business day.

Within a week2. Walk the site

Tore comes out, measures, checks grade and utilities, and talks through what you want the room to do. You get a written price, not a range.

Two to four weeks3. Drawings and permit

Simple plans are drawn and filed with the county. Materials are ordered so nothing waits once the ground is opened.

Week 1 on site4. Piers and floor

Concrete piers below frost line, pressure treated floor system, insulated.

Week 1 to 25. Frame and dry in

Walls, roof, house wrap, windows and doors. Weather tight, usually within two weeks of the first cut.

Week 3 to 56. Outside finish

Siding, trim, roofing, lighting, steps or deck. Matched to the house.

Week 4 to 77. Inside finish

Electrical, insulation, ceiling, walls, floor, trim and paint.

Last day8. Walk through

You and Tore go through every detail together. Final inspection is scheduled, and you get the permit paperwork for your records.

What you get along the way.

A photo text at the end of each day

You see what went up, even if you were at work.

One number, written down

The price you are given is the price, unless you change the plan.

Permits pulled in your county

Bedford or Franklin, inspections scheduled around the build.

A clean site every evening

Tools put away, scrap stacked, yard usable.

Ready to add the room?

Send a few photos of the spot. You get a straight answer on what it will take.

Send Photos for an Estimate